Key Points
- New York cannabis operators must use Metrc for seed-to-sale tracking heading into 2026.
- All license holders — including permitted testing labs — must complete Metrc Learn training before receiving system credentials. The STS Administrator for each facility must finish the New York New Business Fundamentals course, followed by the mandatory Metrc Training: Testing Facility module.
- Labs must configure their LIMS API to push compliant Certificates of Analysis (CoAs) directly into Metrc. Products cannot legally move to retail until test results are uploaded into the system and reflect a passing status.
Why New York Switched From BioTrack to Metrc
New York’s cannabis testing laboratories are navigating one of the most consequential regulatory shifts heading into 2026. After months of integration work with BioTrack as the state’s official seed-to-sale (STS) system, the New York Office of Cannabis Management (OCM) announced in September 2025 that the state would transition to Metrc instead.
New York had been rolling out BioTrack through much of 2024 and early 2025, with permitted laboratories required to achieve real-time reporting by June 15, 2025. In August 2025, Metrc and BioTrack announced a strategic partnership under which Metrc assumed BioTrack’s government contracts. The OCM conducted a comprehensive assessment of both systems and determined that Metrc’s audit trail capabilities, reporting infrastructure, and existing multi-state integrations offered a better fit for New York’s maturing cannabis market.
The financial implications were largely neutral. Facilities that had pre-purchased BioTrack UIDs were also eligible for equivalent Metrc credits. For third-party software providers, Metrc does not charge API access fees, removing a financial barrier for LIMS and other integrators supporting the transition.
What the Transition Means for Testing Laboratories
For New York testing laboratories, 2026 marks the beginning of mandatory Metrc-based reporting and compliance workflows. Testing laboratories occupy a unique and critical position in the Metrc ecosystem. Unlike cultivators or retailers who primarily track physical inventory movement, labs must report analytical data — test results, pass/fail determinations, and CoAs — directly into Metrc. Crucially, source packages remain locked in a “Submitted for Testing” status until the lab uploads results. Products cannot move to retail until those results are in the system.
The OCM confirms that any business physically handling cannabis products — including permitted testing laboratories — must be credentialed in Metrc and submit laboratory testing data directly into the system. This means the migration is not optional and the stakes for getting it right are high: labs that fail to report correctly can inadvertently lock their clients out of the supply chain.
Migrating your New York cannabis lab from BioTrack to Metrc requires credentialing via Metrc Learn, mapping your LIMS API, and ensuring that all third-party systems are configured to receive client samples, generate manifests, and push compliant CoAs into the state’s tracking environment.
BioTrack to Metrc Migration Timeline for New York Labs
The New York cannabis industry’s transition from BioTrack to Metrc accelerated throughout 2025 and culminated in full Metrc adoption in 2026. Key milestones include:
- June 2025: Laboratories were required to achieve real-time reporting through BioTrack.
- August 2025: Metrc and BioTrack announced a strategic partnership, with Metrc assuming BioTrack’s government contracts.
- September 2025: The New York OCM officially selected Metrc as the state’s seed-to-sale tracking platform.
- 2026: Cannabis licensees, including testing laboratories, are required to operate through Metrc and complete all credentialing, training, and integration requirements.
For testing laboratories, early preparation in 2026 is essential to avoid compliance disruptions and reporting delays.
A Step-by-Step Metrc Migration Checklist for New York Testing Labs
1. Account Setup & Credentialing
The credentialing process for testing facilities follows a specific, sequential path. Getting this right is the prerequisite for everything else.
- Administrator Training: The facility’s designated Seed-to-Sale (STS) Administrator must first register on Metrc Learn (learn.metrc.com) and complete the New York New Business Fundamentals training. Upon passing the assessment, credentials are automatically sent to Metrc Support for processing. The administrator then receives a welcome email with login credentials and must activate the account within 72 hours. After that, the administrator must complete the mandatory Metrc Training: Testing Facility course in Metrc Learn — this second training is required before receiving the testing facility resource materials, including the NY Testing Facility User Guide and the NY CSV Test Batch Template Spreadsheet.
- Employee Access: Once the administrator is credentialed and the business profile is set up, the administrator must add all employees into Metrc, assign appropriate roles and permissions (e.g., sampler, analyst, admin), and configure facility locations to mirror how the lab is physically arranged — for example, Receiving Area, Analysis Area, Storage Vault, and Quarantine Area. Employee permissions can be added or adjusted at any time, but setting them up correctly from the outset prevents access bottlenecks during live operations.
- Employee Training: Once staff have been added to the system, training should begin immediately. All employees who will interact with Metrc — whether accepting transfers, recording test results, or uploading CoAs — must complete the relevant Metrc Learn courses for their role. Metrc Learn offers over 300 on-demand courses available 24/7, including role-specific and license-type-specific modules. Labs should also take advantage of Metrc Expert, an AI-powered help tool accessible directly within the Metrc interface that allows staff to get answers to workflow questions in real time without disrupting operations. Designating in-house Metrc champions — staff members who complete advanced training early and serve as internal points of contact — helps distribute compliance knowledge across the team and reduces dependency on external support during the critical go-live period.
2. LIMS & Integration Setup
For laboratories using a Laboratory Information Management System (LIMS), the transition to Metrc requires updating API integrations to connect with the new platform.
- API Configuration: Once credentialed, your administrator will have access to a Metrc API key. This key must be configured in your LIMS and any other integrated platforms. Metrc does not charge third-party integrators to access the API, so there is no financial barrier to updating these connections. Labs should confirm with their LIMS vendor that the integration has been validated against Metrc’s New York environment — Metrc maintains a list of validated third-party integrators. All LIMS integrators must go through Metrc’s standard integration process, so early coordination with your provider is essential.
- Legacy Data: The OCM has placed responsibility on operators to retain legacy BioTrack data for audit purposes during and after the migration. Labs should export all package IDs, transfer logs, manifest histories, and CoAs generated under BioTrack into a locally accessible, readable format. This data must remain available for OCM review and should be mapped against any active inventory or in-process transfers to prevent reconciliation gaps during the cutover.
3. Lab Sample Workflows & Testing
In the Metrc ecosystem, testing workflows rely on precise digital tracking from intake through result release. Labs should train all relevant staff on the following sequence before go-live.
- Sample Intake: Cultivators or processors create a virtual lab sample package in Metrc and transfer it to the lab. The lab must accept this digital transfer in their Metrc dashboard upon physical receipt of the samples. When signing the Metrc manifest, labs take on responsibility for ensuring the information on the manifest accurately reflects the samples collected. Transfers can be rejected entirely or partially if the manifest contains errors.
- Testing Groups and Product Types: When creating a test sample in Metrc, the laboratory selects the applicable state-defined product type and testing group — for example, “Adult Use (AU) Inhalable Concentrates” for vape products. The correct Lab Test Batch must also be selected at this stage. Sub-contract test samples are created from existing test samples, while retention or reserve samples are created at the licensee’s location as regular packages.
- Uploading Results: Labs can upload test results in one of three ways: manual entry in the Metrc interface, CSV file import (supporting up to 10,000 rows or 1 MB per file), or direct API submission from a connected LIMS. The source package remains in a “Submitted for Testing” or “Testing in Progress” status until final results are recorded. Once passing results are entered, the package moves to “Test Passed” and is released for sale. If results fail, the licensee must decide whether to remediate, request a retest (where permitted), or destroy the product.
- CoA Upload: Metrc provides a dedicated CoA upload function within the package record. Once uploaded, the CoA is visible to the licensee via a “Doc” button in their Metrc interface. The OCM’s Retail ID QR code system links each retail package to the CoA for the tested product, so accuracy and completeness of the uploaded document are essential — any discrepancy between the CoA and the Metrc test record creates a compliance exposure.
4. Compliance Guidelines
Labs must comply with OCM-specific testing and sample retention requirements that operate alongside Metrc’s technical workflows.
- Sample Sizes and Retention: Per the New York OCM Cannabis Sampling Standards, licensees must retain representative samples for at least 30 days after the product’s expiration date. Retained sample volume must be sufficient to allow for complete retesting at least two times.
- Pass/Fail Triggers: If a batch fails for certain analytes — such as Aspergillus — retesting is not permitted without sufficient documented evidence of a sampling or analysis error and prior written approval from the OCM. Labs should have clear internal SOPs for handling failures, including how to document the basis for any retest request.
- Multi-Form Products: For products such as vape cartridges, both the bulk oil and the packaged cartridge form require separate testing. Each form must be associated with its own distinct package in Metrc, and each will need its own CoA and UID. Labs working with processors on these product categories should build this into their intake and reporting workflows from the start.
- Enforcement Context: OCM conducts both scheduled and unannounced inspections to verify that physical inventory matches Metrc records. Discrepancies exceeding defined thresholds — for cultivators, 2% variance from Metrc inventory — can trigger mandatory reporting and investigation. Fines for serious violations have exceeded $50,000. More critically, businesses without functioning Metrc integrations can be effectively locked out of the supply chain: distributors cannot legally deliver to a dispensary without a valid Metrc manifest, and labs that fail to upload results prevent client inventory from being released for sale.
Metrc Transition Best Practices
- Reconciliation Check: Coordinate with processor and cultivator clients around the system cutover date. Any samples in transit during the BioTrack-to-Metrc switchover must be clearly reconciled — either as BioTrack “External Transfers” that are closed out in that system, or properly tagged as Metrc packages to avoid inventory discrepancies on both sides.
- Parallel Operations: During the transition window, plan to maintain accurate records in both BioTrack and Metrc simultaneously until the OCM officially decommissions the legacy system. Establish a clear internal cut-off date, communicate it to all staff handling sample receipt, testing, result validation, and reporting, and document which system holds authoritative data at each point in the process.
- Build and Test SOPs Before Go-Live: Labs should use Metrc’s sandbox and test environments — available to API integrators — to validate their full workflow before processing live samples. This includes testing the API connection, CSV upload formats, CoA upload, and transfer acceptance workflows.
- Monitor OCM Bulletins: Continue reviewing STS news and official bulletins on the OCM website at cannabis.ny.gov/seed-to-sale. The OCM publishes downloadable PDF bulletins with integration guidance, compliance reminders, and updated timelines. Labs with compliance questions can also contact the OCM directly at lab.compliance@ocm.ny.gov.
How the Right Cannabis LIMS Eases Your Metrc Transition
For testing laboratories navigating the shift from BioTrack to Metrc, a cannabis LIMS with built-in integration with Metrc is the operational infrastructure that keeps data flowing accurately between your lab and the state’s tracking system.
Key capabilities to look for include automated sample intake and workflow routing, which reduces the risk of samples being mislabeled or processed out of sequence. Full chain-of-custody tracking at every handoff creates the defensible audit trail the OCM requires. Instrument integration for automated reporting of test results eliminates manual transcription errors between your analytical equipment and compliance reporting. A direct REST API integration with Metrc pushes test results into the state platform in real time, keeping client inventory moving without delays. Finally, automated CoA generation linked to specific Metrc package UIDs ensures the document the OCM requires to activate each product’s Retail ID QR code is accurate, complete, and submitted without manual re-entry.
Staff training management is another area where an advanced cannabis LIMS adds value during the transition. As staff work through mandatory Metrc credentialing and role-specific courses on Metrc Learn, a LIMS that logs training completion, tracks competency by role, and flags overdue certifications keeps compliance teams ahead of OCM audit requirements — without relying on spreadsheets or manual follow-up.
Together, these features support the uninterrupted, audit-ready data flow the OCM’s Metrc implementation demands — and give labs a defensible compliance record when inspections occur.
Common BioTrack to Metrc Migration Mistakes Testing Labs Should Avoid
Migrating from BioTrack to Metrc requires careful planning, accurate data management, and reliable system integrations. Common mistakes that can create compliance risks and operational disruptions include:
- Creating duplicate test sample packages, which can leave products stuck in a testing status and delay their movement through the supply chain.
- Submitting incorrect units of measure or decimal values, resulting in inaccurate potency reporting, rejected submissions, or discrepancies between test records and CoAs.
- Failing to preserve legacy BioTrack identifiers, creating gaps in traceability and audit records during the migration process.
- Relying on manual data entry, which increases the risk of transcription errors, incorrect sample IDs, and inconsistent reporting.
- Using a LIMS that is not fully integrated with Metrc, forcing staff to manually transfer data between systems and increasing the likelihood of compliance errors.
To minimize these risks, laboratories should validate all workflows before go-live, retain legacy BioTrack records, establish clear chain-of-custody procedures, and implement a cannabis LIMS with direct Metrc integration to automate data exchange, test result reporting, and compliance documentation.
Compliance Checklist for New York Testing Labs Migrating to Metrc
Testing laboratories preparing for Metrc implementation in 2026 should confirm that they have:

- Completed Metrc credentialing and required training.
- Configured and tested Metrc API integrations.
- Updated SOPs to reflect Metrc workflows.
- Established chain-of-custody procedures and package history source.
- Validated result reporting along with CoA upload.
- Set up employee roles.
- Conducted end-to-end workflow testing before processing live samples.
A structured compliance checklist helps laboratories reduce implementation risk and maintain uninterrupted operations during the transition.
Why CloudLIMS for Cannabis Testing Compliance?
As cannabis regulations continue to evolve in 2026, testing laboratories need software that can adapt quickly to changing compliance requirements. CloudLIMS helps laboratories maintain regulatory readiness by providing automated sample tracking, comprehensive chain-of-custody documentation, instrument data import, automated CoA generation, and direct integration with state reporting systems such as Metrc.
By reducing manual processes and improving data accuracy, CloudLIMS helps laboratories streamline compliance workflows, maintain audit-ready records, and support timely reporting to regulators and clients alike.
Conclusion
New York’s transition from BioTrack to Metrc in 2026 is a defining compliance moment for permitted testing laboratories — and a broader reminder of how rapidly regulatory infrastructure can change in an emerging market. Labs that complete credentialing early, configure their LIMS integrations properly, train staff on Metrc workflows, and maintain clean legacy data records will be well-positioned for the continued evolution of the state’s cannabis oversight framework.
The principles at play here extend beyond cannabis testing to any regulated laboratory environment navigating a system migration: data integrity, auditability, and well-integrated software are not optional features — they are the foundation of compliant operations. When the regulatory environment shifts, labs with those foundations in place adapt. Those without them face compounding operational and legal risk.
See CloudLIMS’ Metrc Integration in Action
Curious how CloudLIMS can simplify Metrc reporting and support regulatory compliance for your cannabis testing laboratory?
Book a demo to see how CloudLIMS automates Metrc workflows, maintains complete traceability, automates regulatory reporting, and helps your laboratory stay compliant as regulations evolve.
Frequently Asked Questions
What is Metrc?
Metrc is a state-mandated seed-to-sale tracking platform used to monitor cannabis products throughout the supply chain, from cultivation and testing to retail sale.
Why is New York transitioning from BioTrack to Metrc?
New York transitioned from BioTrack to Metrc to improve supply chain visibility, strengthen audit trails, and align with a platform widely used across multiple cannabis markets across states. The decision followed a 2025 partnership in which BioTrack transferred its state government contracts to Metrc.
What challenges do testing labs face during Metrc migration?
Common challenges include updating LIMS integrations, training staff, validating workflows, retaining legacy BioTrack records, and ensuring uninterrupted compliance reporting during the transition.
What happens if laboratories fail state compliance requirements?
Non-compliance can lead to regulatory penalties, failed inspections, and delays that prevent client products from progressing through the supply chain.
Can laboratories operate in multiple states with different track-and-trace systems?
Yes. Many laboratories operate across multiple states, but they must comply with each state’s specific track-and-trace requirements and reporting workflows.
How long does cannabis LIMS implementation take?
Implementation timelines vary depending on laboratory size, workflow complexity, data migration requirements, and integration needs. Planning and validation should begin well before regulatory deadlines.
How does Metrc affect laboratory workflows?
Metrc requires laboratories to digitally track sample transfers, upload test results, maintain chain-of-custody records, and submit CoAs to state tracking systems to support product release.
Why is chain of custody important during migration?
CoC records provide a complete audit trail of sample handling and transfers, helping laboratories maintain data integrity, demonstrate compliance, and avoid discrepancies during the transition.
Customer Login 
